Update on Clubhouse Pool

Many of you have been asking about the situation vis-a-vis our pool. We have unfortunately been facing many back to back issues over the past 6+ months with the machine room, pumps, broken and leaky valves, damaged walls, issue with our vendors to name a few. It has really been a roller coaster.

Opening up of our pool is now imminent. We’ve done some patch repair on the bottom of the pool and it is now filling up with water. It may take a few days to fill up and get the chemicals balanced but we are almost there.

Thank you for your patience.

Electrical Wiring Complete

Rewiring of bollards and garage lights across the Camino Del Prado complex is now complete. We should not be seeing any systemic light issues anymore other than individual bulb or driver burning out.

Thank you for your patience during the construction and digging around the complex.

Update on Pool and Electrical Wiring

As you may already know, we’ve had some challenges with our former pool vendor. We are actively working on getting the pool cleaned and set for the summer. Please hang on with us as we are working to find a new contractor that will help us restore and maintain the pool going forward.

Regarding the electrical wiring of bollards and garage lights, work have started on the last section of our HOA, namely the following units: 1007-A/E, 1007-F/K Bryant and 1339-A/E Henderson. Garage lights and bollards around those sections will be rewired. The work is expected to be completed by May 24th. Power to the bollards and garage lights will be off during that period.

Access to garages in the impacted units will be required to complete the rewiring work. Notes have been left on various gates and mailboxes.

Thanks for your patience.

Clubhouse Status

It’s been long overdue, but the clubhouse kitchen has now been restored. The kitchen floor and walls had been redone to match the clubhouse main room. It looks pretty good! Let’s keep it that way!

Several pool pumps in the machine room have been replaced with brand new ones. However,the pool needs to be cleaned before it can be used. We are working on coordinating the pool cleaning. Once that is done, we will turn on the pool.

Fire Alert

There was recently a fire in one of the homes in our community. The fire started in the wall around the chimney while the fireplace was in use. Even though the fire in the fireplace was out, the fire continued inside the wall. Luckily no one was hurt and the fire was quickly contained.

The Board is currently evaluating the cause of the fire to determine if preventative measures need to be taken to prevent further fires. In the interim, we would like to remind everyone that it is each unit owners responsibility to maintain their fireplace, firebox, and flue. We recommend getting an annual cleaning and inspection of your fireplace fireboxes and flues, and dryer exhausts. And please make sure your smoke and carbon monoxide detectors have fresh batteries. Wired smoke detectors are also a good idea.

December update on various repairs

1- The lighting repair/rewiring work around 1360 G-K Roadrunner, 1035 A-D Castleton, and 1035 E-H Castleton have been completed. The last remaining areas are around 1007 Bryant and 1339 Henderson. These are the last blocks.

2- Also note that the clubhouse kitchen work and machine room pump is still going on and may require temporary electricity cut off after new year.

3- The fence work in the back of 1005-B-C-D-E will be started in the new year.

Thank you for your patience and Happy Holidays.

Clubhouse Repairs

You may have noticed that the clubhouse suffered a leak from the machine room which damaged the kitchen floor and wall (and machine room wall).

The board is working to get the damage repaired. We are hoping to have these issues addressed this calendar year.

Note that during those repairs, the pool will not be accessible, water will not be running in the clubhouse, and electricity may be off occasionally.

Thank you for your patience.

More Update on Lighting

Lighting repairs goes on. 

The  areas around 1010 Bryant, 1355 A-F Sagehen, 1355 G-L Sagehen, and 1350 G-K Roadrunner have been completed.

The next focus will be around 1360 G-K Roadrunner, 1035 A-D Castleton, and 1035 E-H Castleton.

Access to garages in the impacted units will be required to complete the rewiring work.

During this work, certain areas may be cordoned off and not accessible. Thank you for your patience.

Latest Status Update on Lighting

We are continuing with our next chunk of work on lighting repair. 

The next areas of rewiring will be around 1010 Bryant, 1355 A-F Sagehen, 1355 G-L Sagehen, and 1350 G-K Roadrunner. Garage lights and bollards around those sections will be rewired and repaired as needed.

Access to garages in the impacted units will be required to complete the rewiring work.

Update on Fallen Metal Fence behind 1005-A thru 1005-E Bryant way

Some of you may have noticed that the metal fence between the 1005-A-B-C-D-E Bryant way block and the old mobile park site has fallen under the weight of the ivy onto the neighboring units patio fences.

There will be 3 phases to address this issue:

1- clear out the back alley by cutting and removing the fallen ivy and  the broken portion of the fence (this is a security hazard). [ This phase is now complete]

2- repair/replace the fence where broken [This phase is going to be addressed next]

3- address the privacy issue caused by the removed ivy

The above 3 phases will be handled in due course. Thank you for your patience.